Description
The existing 4-storey residential building was 2-shell masonry with an intermediate insulation of 8 cm. For static load reasons, the perimeter wall could not fulfill the requirements of the new cold facade and was therefore completely removed. The aim of the project was to develop a building envelope, which was not only the protective, aesthetic and energetic layer but would also serve as an energy supplier.